{"id":1071,"date":"2023-08-30T17:44:10","date_gmt":"2023-08-30T15:44:10","guid":{"rendered":"https:\/\/frenchbrokers.fr\/?p=1071"},"modified":"2023-08-30T17:52:54","modified_gmt":"2023-08-30T15:52:54","slug":"lassurance-des-risques-industriels-les-12-travaux-dhercule","status":"publish","type":"post","link":"https:\/\/frenchbrokers.fr\/?p=1071","title":{"rendered":"L&#8217;assurance des risques industriels: Les 12 travaux d&#8217;Hercule"},"content":{"rendered":"\n<p><strong><em>Executive summary:<\/em><\/strong><\/p>\n\n\n\n<p><em>To insure property means:<\/em><\/p>\n\n\n\n<p><em>-taking into account large amount of investments<\/em><\/p>\n\n\n\n<p><em>-ensuring the continuation of the business in the eventuality of an adverse event<\/em><\/p>\n\n\n\n<p><em>-protecting the staff and the neighbors<\/em><\/p>\n\n\n\n<p><em>INRS defines \u201cindustrial risk\u201d as:<\/em><\/p>\n\n\n\n<p><em>\u201can accidental event occurring on an industrial site involving dangerous products and\/or processes and resulting in serious immediate consequences for personnel, local population, property and the environment\u201d<\/em><\/p>\n\n\n\n<p><em>By Frenchbrokers, as insurance brokers, we suggest studying industrial insurance through 12 concrete chapters:<\/em><\/p>\n\n\n\n<p><em>1 Nature of the neighborhood<\/em><\/p>\n\n\n\n<p><em>2 Type of construction<\/em><\/p>\n\n\n\n<p><em>3 Organization of space<\/em><\/p>\n\n\n\n<p><em>4 Manufacturing process<\/em><\/p>\n\n\n\n<p><em>5 Sources of energy and heating<\/em><\/p>\n\n\n\n<p><em>6 Quality of electrical installations<\/em><\/p>\n\n\n\n<p><em>7 Quantity and storage of hazardous products<\/em><\/p>\n\n\n\n<p><em>8 Quantity and storage of packaging material<\/em><\/p>\n\n\n\n<p><em>9 Internal and external rescue resources<\/em><\/p>\n\n\n\n<p><em>10 Risk management, schedules<\/em><\/p>\n\n\n\n<p><em>11 Regulatory constraints<\/em><\/p>\n\n\n\n<p><em>12 Capital, business interruption and deductibles<\/em><\/p>\n\n\n\n<p>Introduction&nbsp;:<\/p>\n\n\n\n<p>Comme chacun sait, l\u2019assurance moderne d\u00e9marre v\u00e9ritablement au XIX\u00e8me si\u00e8cle, quand le progr\u00e8s technique et la R\u00e9volution Industrielle conduisent&nbsp;:<\/p>\n\n\n\n<p>-\u00e0 des drames humains sans pr\u00e9c\u00e9dents (l\u2019Opera de Paris est d\u00e9truit en 1873)<\/p>\n\n\n\n<p>-\u00e0 une accumulation de capitaux qui n\u00e9cessite la mise en place de nouveaux outils.<\/p>\n\n\n\n<p>Rappelons que l\u2019industrie fran\u00e7aise repr\u00e9sente (source France Industrie 2023)&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 260 000 entreprises<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Plus de 3 millions d\u2019emplois directs<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 74% des exportations fran\u00e7aises<\/p>\n\n\n\n<p>Position du probl\u00e8me&nbsp;:<\/p>\n\n\n\n<p>En quoi l\u2019assurance d\u2019une usine diff\u00e8re-t-elle de celle d\u2019un atelier ou d\u2019un commerce&nbsp;?<\/p>\n\n\n\n<p>Plusieurs particularit\u00e9s ont \u00e0 consid\u00e9rer&nbsp;:<\/p>\n\n\n\n<p>-l\u2019importance des capitaux \u00e0 couvrir (voir plus haut)<\/p>\n\n\n\n<p>-la s\u00e9curisation financi\u00e8re de la poursuite d\u2019activit\u00e9 en cas de sinistre<\/p>\n\n\n\n<p>-les risques, tant pour le personnel que pour le voisinage et pour l\u2019environnement<\/p>\n\n\n\n<p>D\u00e9finition&nbsp;:<\/p>\n\n\n\n<p>Selon l\u2019INRS (Institut National de Recherche et S\u00e9curit\u00e9), un risque industriel est d\u00e9fini comme&nbsp;:<\/p>\n\n\n\n<p><strong>un \u00e9v\u00e8nement accidentel se produisant sur un site industriel mettant en jeu des produits et\/ou des proc\u00e9d\u00e9s dangereux et entra\u00eenant des cons\u00e9quences imm\u00e9diates graves pour le personnel, les riverains, les biens et l&#8217;environnement<\/strong><\/p>\n\n\n\n<p>Les param\u00e8tres de l\u2019assurance des risques industriels&nbsp;:<\/p>\n\n\n\n<p>Selon les \u00e9l\u00e9ments introductifs ci-dessus, l\u2019assureur et l\u2019industriel devront ainsi s\u2019attacher aux \u00e9l\u00e9ments suivants&nbsp;:<\/p>\n\n\n\n<p>1 Nature du voisinage<\/p>\n\n\n\n<p>2 Type de construction<\/p>\n\n\n\n<p>3 Organisation de l\u2019espace<\/p>\n\n\n\n<p>4 Processus de fabrication<\/p>\n\n\n\n<p>5 Sources d\u2019\u00e9nergie et de chaleur<\/p>\n\n\n\n<p>6 Qualit\u00e9 des installations \u00e9lectriques<\/p>\n\n\n\n<p>7 Quantit\u00e9 et stockage de produits dangereux<\/p>\n\n\n\n<p>8 Quantit\u00e9 et stockage d\u2019emballage<\/p>\n\n\n\n<p>9 Moyens de secours internes et externes<\/p>\n\n\n\n<p>10 Tenue du risque, horaires<\/p>\n\n\n\n<p>11 Contraintes r\u00e9glementaires<\/p>\n\n\n\n<p>12 Capitaux, perte d\u2019exploitation et franchises<\/p>\n\n\n\n<p>Loin d\u2019\u00eatre une liste \u00e0 la Pr\u00e9vert, ces douze \u00e9l\u00e9ments sont les seuls \u00e0 permettre de passer en revue les risques r\u00e9els (d\u2019incendie ou d\u2019explosion par exemple) et les moyens d\u00e9ploy\u00e9s pour y faire face.<\/p>\n\n\n\n<p>Cette \u00e9valuation pourra \u00eatre faite par&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Le courtier et son client<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Un expert d\u2019assur\u00e9 ou un ing\u00e9nieur pr\u00e9ventionniste de compagnie<\/p>\n\n\n\n<p>Elle pourra donner lieu (cas notamment de la compagnie FM Global) \u00e0 des recommandations strictes d\u2019investissements, pr\u00e9alables \u00e0 la mise en place d\u2019un contrat ou plut\u00f4t de 2 contrats&nbsp;:<\/p>\n\n\n\n<p>Dommage aux Biens<\/p>\n\n\n\n<p>Responsabilit\u00e9 Civile.<\/p>\n\n\n\n<p>Passons donc en revue ces 12 chapitres, ces 12 travaux d\u2019Hercule o\u00f9 le courtier devra assister \u00e0 chaque fois activement l\u2019industriel&nbsp;!<\/p>\n\n\n\n<p><strong><u>1 Nature du voisinage<\/u><\/strong><\/p>\n\n\n\n<p>En septembre 2019, l\u2019usine Lubrizol de Rouen br\u00fble, lib\u00e9rant 10 000 tonnes de produits chimiques sur 23 communes. Cet accident nous rappelle l\u2019importance du voisinage de nos industries.<\/p>\n\n\n\n<p>Lubrizol s\u2019inscrit malheureusement dans une lign\u00e9e d\u2019accidents industriels&nbsp;:<\/p>\n\n\n\n<p>-Total Grande Paroisse, \u00e9voqu\u00e9 plus loin<\/p>\n\n\n\n<p>-Seveso, qui est devenu un nom commun&nbsp;:<\/p>\n\n\n\n<p>Le 10 juillet 1976, des tonnes d\u2019herbicide sont d\u00e9vers\u00e9es dans la nature. 3 000 animaux meurent et 77 000 autres doivent \u00eatre abattus.<\/p>\n\n\n\n<p>L\u2019enqu\u00eate indique qu\u2019aucun plan d\u2019urgence n\u2019existait.<\/p>\n\n\n\n<p>L\u2019assureur va analyser&nbsp;:<\/p>\n\n\n\n<p>-la distance de l\u2019usine aux habitations les plus proches<\/p>\n\n\n\n<p>-la dangerosit\u00e9 des activit\u00e9s mitoyennes<\/p>\n\n\n\n<p>-la distance du centre de secours, la pr\u00e9sence de bornes d\u2019incendie<\/p>\n\n\n\n<p>-les risques enregistr\u00e9s dans le PPRN&nbsp;(plan de pr\u00e9vention des risques naturels):<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Inondation<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sismicit\u00e9<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Glissements de terrain<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Etc<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Le courtier va aider l\u2019entreprise \u00e0 analyser le PPRI (Plan de pr\u00e9vention des risques d\u2019inondation), pour indiquer ou non \u00e0 la compagnie si le risque est en zone inondable.<\/em><\/p>\n\n\n\n<p class=\"has-white-background-color has-background\"><strong><u>2 Type de construction&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>L\u2019assureur examine le type de mat\u00e9riaux impliqu\u00e9s dans&nbsp;:<\/p>\n\n\n\n<p>-les planchers<\/p>\n\n\n\n<p>-les murs ext\u00e9rieurs<\/p>\n\n\n\n<p>-la charpente<\/p>\n\n\n\n<p>-la couverture<\/p>\n\n\n\n<p>Rappelons notamment que les poutrelles m\u00e9talliques ont une r\u00e9sistance au feu tr\u00e8s r\u00e9duite.<\/p>\n\n\n\n<p>De m\u00eame, les cloisons en polyur\u00e9thane utilis\u00e9es dans l\u2019industrie agroalimentaire doivent \u00eatre bien pos\u00e9es et entretenues, car elles offrent une vuln\u00e9rabilit\u00e9 importante au feu.<\/p>\n\n\n\n<p>Il va sans dire que les vieux b\u00e2timents en bois, les escaliers bois sont \u00e0 proscrire.<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019industriel aura tout int\u00e9r\u00eat \u00e0 soumettre \u00e0 l\u2019assureur (via son courtier) un projet de construction, pour int\u00e9grer \u00e0 moindre frais ses recommandations.<\/em><\/p>\n\n\n\n<p><strong><u>3 Organisation de l\u2019espace&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>L\u2019agencement interne est au moins aussi important que la qualit\u00e9 du b\u00e2ti&nbsp;:<\/p>\n\n\n\n<p>Le stockage est-il limit\u00e9 \u00e0 7,20m&nbsp;?<\/p>\n\n\n\n<p>Quel est le pourcentage de la surface affect\u00e9 au stockage&nbsp;?<\/p>\n\n\n\n<p>Les espaces de stockage et de fabrication sont-ils distincts&nbsp;?<\/p>\n\n\n\n<p>Le sont-ils gr\u00e2ce \u00e0 un mur s\u00e9paratif coupe-feu&nbsp;?<\/p>\n\n\n\n<p>Y a-t-il des \u00e9l\u00e9ments combustibles entrepos\u00e9s le long des murs ext\u00e9rieurs&nbsp;?<\/p>\n\n\n\n<p>Le balisage de secours est-il pr\u00e9sent, correct et op\u00e9rationnel&nbsp;?<\/p>\n\n\n\n<p>L\u2019usine est-elle encombr\u00e9e&nbsp;?<\/p>\n\n\n\n<p>L\u2019approche des secours est-elle ais\u00e9e&nbsp;?<\/p>\n\n\n\n<p>Quid des mouvements de v\u00e9hicules et des parkings&nbsp;?<\/p>\n\n\n\n<p>L\u2019organisation de l\u2019espace va \u00e9galement aider l\u2019assureur \u00e0 d\u00e9terminer le SMP (Sinistre maximum possible)&nbsp;:<\/p>\n\n\n\n<p>-les b\u00e2timents (production, bureau, stocks) sont-ils clairement s\u00e9par\u00e9s les uns des autres&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -sont-ils au contraire group\u00e9s, voire imbriqu\u00e9s&nbsp;?<\/p>\n\n\n\n<p>L\u2019organisation de l\u2019espace joue donc sur le SMP, et le SMP a une incidence sur la capacit\u00e9 de l\u2019assureur \u00e0 prendre en charge le risque&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -Entreprise est constitu\u00e9e de 2 b\u00e2timents de 10 mios \u20ac de valeur, bien s\u00e9par\u00e9s&nbsp;:<\/p>\n\n\n\n<p>l\u2019assureur peut prendre en charge<\/p>\n\n\n\n<p>-Entreprise constitu\u00e9e de 2 b\u00e2timents accol\u00e9s de 10 mios \u20ac&nbsp;chacun:<\/p>\n\n\n\n<p>Les capitaux de 20 mios exc\u00e8dent la capacit\u00e9 de l\u2019assureur, qui devra rechercher une solution (par ex en coassurance).<\/p>\n\n\n\n<p>Une entreprise pr\u00e9sente sur de nombreux sites pourra utiliser un logiciel de gestion des risques (aliment\u00e9 par les responsables locaux)<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Cet apport peut se r\u00e9v\u00e9ler d\u00e9terminant (par exemple pour proposer de d\u00e9m\u00e9nager une activit\u00e9 ou un stock sensible, trop proche de l\u2019usine)&nbsp;.<\/em><\/p>\n\n\n\n<p>`<\/p>\n\n\n\n<p><strong><u>4 Processus de fabrication&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>C\u2019est un point essentiel de l\u2019\u00e9valuation.<\/p>\n\n\n\n<p>Ce processus implique-t-il&nbsp;:<\/p>\n\n\n\n<p>-l\u2019utilisation de plastiques<\/p>\n\n\n\n<p>-de solvants<\/p>\n\n\n\n<p>-de bois<\/p>\n\n\n\n<p>-de travail par point chaud<\/p>\n\n\n\n<p>Est-il g\u00e9n\u00e9rateur de risques d\u2019explosion et une \u00e9tude ATEX (risques d\u2019explosion) a-t-elle \u00e9t\u00e9 men\u00e9e&nbsp;?<\/p>\n\n\n\n<p>L\u2019\u00e9tude devra d\u00e9crire en d\u00e9tail&nbsp;:<\/p>\n\n\n\n<p>-les mati\u00e8res premi\u00e8res utilis\u00e9es<\/p>\n\n\n\n<p>-les proc\u00e9d\u00e9s mis en \u0153uvre<\/p>\n\n\n\n<p>-les types de semi-finis et de produits finis obtenus<\/p>\n\n\n\n<p>L\u2019assureur examinera si sont mises en \u0153uvre les Bonnes Pratiques de Fabrication (BPF ou GMP <em>Good Manufacturing Practices<\/em>).<\/p>\n\n\n\n<p>La nature de l\u2019activit\u00e9 (injection plastique, travail du bois,..) sera d\u00e9terminante dans l\u2019acceptation ou le refus de l\u2019assureur, et dans le taux d\u2019assurance propos\u00e9.<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Le principal apport du courtier est d\u2019expliquer en des termes clairs et non \u00e9quivoques le <\/em>business model<em> et le processus de fabrication aux souscripteurs des compagnie (puis de s\u2019assurer de leur fid\u00e8le retranscription dans le contrat).<\/em><\/p>\n\n\n\n<p><strong><u>5 Sources d\u2019\u00e9nergie et de chaleur&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Cette analyse vise bien \u00e9videmment \u00e0 comprendre les sources internes possibles d\u2019un incendie.<\/p>\n\n\n\n<p>L\u2019assureur va examiner la\/les chaudi\u00e8re(s)&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -puissance&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -local isol\u00e9 ou non&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -source d\u2019\u00e9nergie&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -contrat d\u2019entretien&nbsp;?<\/p>\n\n\n\n<p>L\u2019analyse sera faite pour le chauffage&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Industriel<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Du stock, le cas \u00e9ch\u00e9ant<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Des locaux<\/p>\n\n\n\n<p><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p><em>Inciter l\u2019industriel \u00e0 isoler la chaudi\u00e8re, afin de r\u00e9pondre aux exigences des compagnies<\/em><\/p>\n\n\n\n<p><strong><u>6 Qualit\u00e9 des installations \u00e9lectriques&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Ici encore, l\u2019analyse vise \u00e0 comprendre la contribution \u00e9ventuelle du r\u00e9seau \u00e9lectrique \u00e0 un sinistre.<\/p>\n\n\n\n<p>L\u2019assureur va exiger la production de certificats, de pr\u00e9f\u00e9rence issus d\u2019un organisme agr\u00e9\u00e9 APSAD&nbsp;(Assembl\u00e9 Permanente des Soci\u00e9t\u00e9s d\u2019Assurance Dommages):<\/p>\n\n\n\n<p>Q18 (v\u00e9rification des installations \u00e9lectriques)<\/p>\n\n\n\n<p>Ces v\u00e9rifications devront \u00eatre reconduites sur une base annuelle.<\/p>\n\n\n\n<p>De plus l\u2019assureur va examiner&nbsp;:<\/p>\n\n\n\n<p>-les transformateurs appartenant au client&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sont-ils dans un local incombustible d\u00e9di\u00e9&nbsp;?<\/p>\n\n\n\n<p>-les abords des chargeurs de batteries, armoires, transformateurs (qui doivent \u00eatre libres sur 1,5m)<\/p>\n\n\n\n<p>L\u2019assureur pourra demander \u00e0 proc\u00e9der \u00e0 une coupure partielle ou totale de l\u2019alimentation pour tester le fonctionnement des BAES (blocs autonomes d\u2019\u00e9clairage de s\u00e9curit\u00e9).<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Inciter l\u2019industriel \u00e0 proc\u00e9der \u00e0 une analyse des surchauffes, \u00e0 l\u2019aide d\u2019une cam\u00e9ra thermique, analyse tr\u00e8s pr\u00e9dictive d\u2019un sinistre futur. Cette analyse d\u00e9bouche sur un certificat Q19.<\/em><\/p>\n\n\n\n<p><strong><u>7 Quantit\u00e9 et stockage de produits dangereux&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>L\u2019assureur examine avec l\u2019industriel&nbsp;:<\/p>\n\n\n\n<p>-la nature<\/p>\n\n\n\n<p>-les quantit\u00e9s<\/p>\n\n\n\n<p>-les conditions de stockage (local, ventilation, arrimage, conditionnement)<\/p>\n\n\n\n<p>-les conditions de transvasement<\/p>\n\n\n\n<p>-la stabilit\u00e9 des produits (aux variations de temp\u00e9rature notamment)<\/p>\n\n\n\n<p>des mati\u00e8res dangereuses&nbsp;:<\/p>\n\n\n\n<p>-gaz<\/p>\n\n\n\n<p>-liquides<\/p>\n\n\n\n<p>-mati\u00e8res radioactives<\/p>\n\n\n\n<p>Les mati\u00e8res devront \u00eatre stock\u00e9es dans un local autonome, ou \u00e0 l\u2019ext\u00e9rieur.<\/p>\n\n\n\n<p>L\u2019INRS \u00e9met notamment les recommandations suivantes&nbsp;:<\/p>\n\n\n\n<p>Limiter l\u2019acc\u00e8s au stockage aux seules personnes form\u00e9es et autoris\u00e9es.<\/p>\n\n\n\n<p>Tenir \u00e0 jour un \u00e9tat du stock.<\/p>\n\n\n\n<p>Subordonner le stockage d\u2019un produit \u00e0 l\u2019existence de sa fiche de donn\u00e9es de s\u00e9curit\u00e9 et de son \u00e9tiquetage.<\/p>\n\n\n\n<p>Mettre en place un classement rigoureux et connu (affichage d\u2019un plan, interdiction d\u2019entreposer des emballages volumineux ou lourds en hauteur, pas d\u2019entreposage d\u2019outillage et de mat\u00e9riel dans le local de stockage de produits chimiques\u2026).<\/p>\n\n\n\n<p>Instaurer une r\u00e8gle de d\u00e9stockage \u00ab premier entr\u00e9 \/ premier sorti \u00bb.<\/p>\n\n\n\n<p>Respecter les dates de p\u00e9remption de produits.<\/p>\n\n\n\n<p>Mettre en place une proc\u00e9dure d\u2019\u00e9limination des produits inutiles ou p\u00e9rim\u00e9s.<\/p>\n\n\n\n<p>Interdire l\u2019encombrement des voies d\u2019acc\u00e8s, des issues et \u00e9quipements de secours.<\/p>\n\n\n\n<p>Le m\u00e9ga-sinistre Total\/Grande Paroisse (31 victimes le 21 septembre 2011) est l\u00e0 pour nous rappeler l\u2019importance de ce sujet du stockage des produits dangereux.<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Etudier avec l\u2019industriel un d\u00e9m\u00e9nagement de certains stocks trop pr\u00e8s du c\u0153ur de l\u2019usine, et ne b\u00e9n\u00e9ficiant pas de bacs de r\u00e9tention ad\u00e9quats.<\/em><br><\/p>\n\n\n\n<p><strong><u>8 Quantit\u00e9 et stockage d\u2019emballage&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Encore un sujet qui pr\u00e9occupe, \u00e0 juste titre les assureurs&nbsp;:<\/p>\n\n\n\n<p>Les emballages sont l\u00e0 pour garantir l\u2019int\u00e9grit\u00e9 des produits quand ils quittent l\u2019usine.<\/p>\n\n\n\n<p>Mais sur le site, ils repr\u00e9sentent plut\u00f4t un danger&nbsp;:<\/p>\n\n\n\n<p>-montagnes de cartons \u00e0 plat pr\u00e8s des lignes<\/p>\n\n\n\n<p>-rouleaux de <em>sleevers<\/em><\/p>\n\n\n\n<p>-mauvaise gestion des rebuts, protection insuffisante des compacteurs pour les op\u00e9rateurs<\/p>\n\n\n\n<p>m\u00eame si (sauf les palettes) les emballages \u00ab&nbsp;emball\u00e9s&nbsp;\u00bb (c\u2019est-\u00e0-dire \u00e0 plat, en rouleau,..) sont peu combustibles car tr\u00e8s compacts.<\/p>\n\n\n\n<p>L\u2019assureur va donc demander le nombre de m3 d\u2019emballages pr\u00e9sents.<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Faire rapidement dispara\u00eetre les piles de palettes vides stock\u00e9es le long des parois de l\u2019usine.<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>&nbsp;Elles sont contraires aux r\u00e8gles d\u2019assurance, et repr\u00e9sentent un r\u00e9el danger (si par exemple des jeunes viennent y tra\u00eener le week-end et occasionnent un d\u00e9part de feu).<\/em><\/p>\n\n\n\n<p><strong><u>9 Moyens de secours internes et externes&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Voici un chapitre essentiel, o\u00f9 l\u2019industriel est sollicit\u00e9&nbsp;:<\/p>\n\n\n\n<p>9.1 Moyens de secours internes&nbsp;:<\/p>\n\n\n\n<p>911 Moyens mat\u00e9riels&nbsp;:<\/p>\n\n\n\n<p>Il s\u2019agit d\u2019abord des moyens de lutte contre l\u2019incendie&nbsp;:<\/p>\n\n\n\n<p>Extincteurs&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -adapt\u00e9s au type de feu (feu \u00e9lectrique, feu d\u2019hydrocarbures,)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -en nombre suffisant<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -r\u00e9guli\u00e8rement v\u00e9rifi\u00e9s par une entreprise certifi\u00e9e APSAD<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e9ventuellement sur roues (plus mobiles, plus puissants)<\/p>\n\n\n\n<p>RIA (Robinets d\u2019incendie Arm\u00e9s)&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -il s\u2019agit de lances \u00e0 incendie, sur d\u00e9vidoir, toutes pr\u00eates (arm\u00e9es = sous pression)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -elles doivent naturellement \u00eatre en nombre suffisant<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -elles permettent de lutter contre des incendies en hauteur<\/p>\n\n\n\n<p>Sprinklers&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -moins pr\u00e9sents chez nous qu\u2019aux USA, ils permettent une lutte imm\u00e9diate et souvent radicale<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -leur installation et leur maintenance sont fort couteux<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -ils supposent la mise en place de \u00ab&nbsp;sources&nbsp;\u00bb, c\u2019est-\u00e0-dire d\u2019alimentation en eau en d\u00e9bit, quantit\u00e9 et pression suffisants<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -ils sont de diff\u00e9rents types, selon que le circuit est en permanence sous pression ou non.<\/p>\n\n\n\n<p>Les poteaux incendie&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -plac\u00e9s \u00e0 l\u2019ext\u00e9rieur, et aliment\u00e9s \u00e0 partir en g\u00e9n\u00e9ral de la commune, ils sont cens\u00e9s offrir un d\u00e9bit de 60 m3\/h sous 1 bar<\/p>\n\n\n\n<p>D\u00e9tection incendie&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -Quel syst\u00e8me, vers qui reporte-t-il, est-il test\u00e9&nbsp;?<\/p>\n\n\n\n<p>Protection contre la foudre<\/p>\n\n\n\n<p>Il s\u2019agit ensuite de pr\u00e9venir l\u2019intrusion&nbsp;:<\/p>\n\n\n\n<p>L\u2019intrusion ne conduit pas seulement au vol, mais peut aussi mener&nbsp;:<\/p>\n\n\n\n<p>-\u00e0 du pur vandalisme (tags,..) souvent plus couteux qu\u2019un simple vol<\/p>\n\n\n\n<p>-\u00e0 la mise en d\u00e9faut ou en danger d\u2019\u00e9quipements<\/p>\n\n\n\n<p>-\u00e0 des dommages corporels aux intrus.. lesquels pourraient \u00eatre reproch\u00e9s \u00e0 la firme&nbsp;!<\/p>\n\n\n\n<p>Protection des portes&nbsp;:<\/p>\n\n\n\n<p>Blindages<\/p>\n\n\n\n<p>Type de serrure<\/p>\n\n\n\n<p>Contr\u00f4les d\u2019acc\u00e8s<\/p>\n\n\n\n<p>Protections des fen\u00eatres (et notamment celles au RDC)<\/p>\n\n\n\n<p>Barreaudage des skydomes (pour \u00e9viter les entr\u00e9es \u00ab&nbsp;par le haut&nbsp;\u00bb)<\/p>\n\n\n\n<p>Cl\u00f4ture et suivi vid\u00e9o<\/p>\n\n\n\n<p>912 Moyens humains&nbsp;:<\/p>\n\n\n\n<p>Ce sont sans doute les plus importants&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -l\u2019industriel n\u2019a pas vocation \u00e0 se substituer aux pompiers (sauf tr\u00e8s grands risques)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -l\u2019initiative de l\u2019industriel (POI, PCA,..) peut se r\u00e9v\u00e9ler d\u00e9terminante<\/p>\n\n\n\n<p>L\u2019assureur commence par dresser un inventaire de ces moyens&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -quel balisage&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -existe-t-il des pompiers volontaires (au sein de l\u2019\u00e9tablissement)&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -existe-t-il une \u00e9quipe de premi\u00e8re intervention&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -le personnel est-il form\u00e9&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -permis de feu<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -tabac<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -manipulation des extincteurs<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -exercices d\u2019\u00e9vacuation<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -parking automobile ordonn\u00e9 et tourn\u00e9 vers la sortie (si risque ATEX)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -existe-il un PCA (plan de continuation d\u2019activit\u00e9) permettant de maintenir une ligne d\u2019action en cas de sinistre<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -pour les sites Seveso, et parfois pour les sites class\u00e9s, un POI (plan d\u2019Op\u00e9ration Interne) tr\u00e8s d\u00e9taill\u00e9 et revu tous les 3 ans permet de maintenir un bon niveau de vigilance.<\/p>\n\n\n\n<p>Surveillance humaine&nbsp;contre l\u2019intrusion :<\/p>\n\n\n\n<p>Gardiennage<\/p>\n\n\n\n<p>H24 ou non<\/p>\n\n\n\n<p>Nom de la soci\u00e9t\u00e9<\/p>\n\n\n\n<p>9.2 Moyens de secours externes&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; L\u2019assureur analyse l\u2019importance des moyens externes vs la taille du site assur\u00e9&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -s\u2019agit-il de pompiers volontaires ou professionnels&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -distance et temps d\u2019intervention \u00e0 pr\u00e9voir&nbsp;?<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -ad\u00e9quation du mat\u00e9riel<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Le courtier pourra proposer et superviser un rep\u00e9rage du site par les pompiers.<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Ce rep\u00e9rage (bornes d\u2019incendie, proc\u00e9dures, hauteurs d\u2019intervention, dangers \u00e9ventuels, principaux contacts) pourra se r\u00e9v\u00e9ler pr\u00e9cieux en cas de sinistre ult\u00e9rieur.<\/em><\/p>\n\n\n\n<p><strong><u>10 Tenue du risque, horaires&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>Plus subjective, l\u2019appr\u00e9ciation de la tenue du risque se r\u00e9v\u00e8le essentielle&nbsp;:<\/p>\n\n\n\n<p>-les abords sont-ils propres&nbsp;?<\/p>\n\n\n\n<p>-les all\u00e9es sont-elles d\u00e9gag\u00e9es&nbsp;?<\/p>\n\n\n\n<p>-les zones de charge \u00e9lectrique sont-elles encombr\u00e9es&nbsp;?<\/p>\n\n\n\n<p>-quelle est la fr\u00e9quence du nettoyage et du d\u00e9poussi\u00e9rage&nbsp;?<\/p>\n\n\n\n<p>-les consignes sont-elles connues&nbsp;?<\/p>\n\n\n\n<p>-comme d\u00e9j\u00e0 vu, le permis de feu est-il connu et utilis\u00e9&nbsp;?<\/p>\n\n\n\n<p>-les horaires de l\u2019activit\u00e9 ne sont pas sans incidence&nbsp;:<\/p>\n\n\n\n<p>-fonctionnement en 3X8 7\/7, en 3X8 5 sur 7, en 2X8&nbsp;?<\/p>\n\n\n\n<p>-horaires d\u2019ouverture<\/p>\n\n\n\n<p>-horaires d\u2019ouverture au public \u00e9ventuel&nbsp;?<\/p>\n\n\n\n<p>-existence de machines fonctionnant de mani\u00e8re autonome pendant la fermeture&nbsp;?<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier :<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Le courtier joue ici un r\u00f4le essentiel :<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-pour alerter la compagnie en cas de probl\u00e8me (fut-ce donc contre son propre int\u00e9r\u00eat)<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-pour former et inciter l\u2019industriel \u00e0 la pr\u00e9vention<\/em><\/p>\n\n\n\n<p><strong><u>11 Contraintes r\u00e9glementaires&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>L\u2019industriel est tenu \u00e0 de nombreuses contraintes r\u00e9glementaires, qui constituent autant de gages de s\u00e9curit\u00e9 pour l\u2019assureur&nbsp;:<\/p>\n\n\n\n<p>11.1 \u00c9tablissements recevant du public&nbsp;(ERP)&nbsp;:<\/p>\n\n\n\n<p>Ob\u00e9issants \u00e0 diff\u00e9rentes r\u00e8gles selon le nombre de personnes accueillies et le type d\u2019\u00e9tablissement, les ERP suivent des normes en termes notamment&nbsp;:<\/p>\n\n\n\n<p>-de dimensionnement des issues<\/p>\n\n\n\n<p>-de cheminements d\u2019\u00e9vacuation<\/p>\n\n\n\n<p>-etc<\/p>\n\n\n\n<p>Logiquement, l\u2019assureur demandera la date de la derni\u00e8re visite de la \u00ab&nbsp;commission de s\u00e9curit\u00e9&nbsp;\u00bb, son rapport, ses pr\u00e9conisations et leur suivi.<\/p>\n\n\n\n<p>Sans pour autant \u00eatre un ERP, le site industriel r\u00e9fl\u00e9chira activement&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -aux modalit\u00e9s d\u2019accueil des visiteurs<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e0 la proc\u00e9dure applicable aux livraisons<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -au traitement des ventes du \u00ab&nbsp;magasin d\u2019usine&nbsp;\u00bb<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -au cheminement lors des visites (qui pourra \u00eatre int\u00e9gr\u00e9 d\u00e8s la conception d\u2019un nouveau site).<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e0 la protection des salari\u00e9s, \u00e9tant ici rappel\u00e9 que l\u2019entreprise a \u00e0 leur encontre une obligation de r\u00e9sultat (qui s\u2019\u00e9tend \u00e0 leurs trajets domicile\/travail)<\/p>\n\n\n\n<p>11.2 Installation class\u00e9e pour la protection de l\u2019environnement&nbsp;(ICPE):<\/p>\n\n\n\n<p>Ce suivi administratif est variable selon la dangerosit\u00e9 et la taille de l\u2019installation.<\/p>\n\n\n\n<p>On rel\u00e8ve les installations soumises&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e0 d\u00e9claration<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e0 enregistrement<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e0 autorisation<\/p>\n\n\n\n<p>L\u00e0 encore, les pr\u00e9conisations et injonctions de l\u2019administration seront pr\u00e9cieuses pour l\u2019assureur.<\/p>\n\n\n\n<p>Ajoutons que les ICPE ont une obligation de souscription d\u2019une police sp\u00e9cifique \u00ab&nbsp;atteintes \u00e0 l\u2018environnement&nbsp;\u00bb, les garanties-environnement des polices standard ne s\u2019appliquant pas.<\/p>\n\n\n\n<p>A ces cat\u00e9gories, on rajoutera le classement Seveso, qui concerne les installations les plus dangereuses et\/ou polluantes.<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Il est double&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-Le courtier veille au respect des r\u00e9glementations (et donc des mesures exig\u00e9es par les compagnies)<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-Il utilise ces contraintes r\u00e9glementaires pour rehausser le niveau de pr\u00e9vention du site<\/em><br><\/p>\n\n\n\n<p><strong><u>12 Capitaux, perte d\u2019exploitation et franchises&nbsp;:<\/u><\/strong><\/p>\n\n\n\n<p>C\u2019est l\u00e0 un point fondamental, l\u2019usine \u00e9tant \u00e0 la fois le lieu de risques \u00e0 cerner\/ma\u00eetriser et un lieu o\u00f9 sont amass\u00e9s des capitaux importants&nbsp;:<\/p>\n\n\n\n<p>12.0 B\u00e2timents&nbsp;:<\/p>\n\n\n\n<p>Le plus souvent, l\u2019industriel est locataire de ses b\u00e2timents.<\/p>\n\n\n\n<p>M\u00eame dans ce cas, l\u2019industriel doit assurer ses b\u00e2timents \u00e0 leur valeur de reconstruction \u00e0 neuf&nbsp;: le locataire est pr\u00e9sum\u00e9 responsable en cas d\u2019incendie&nbsp;! On parle de \u00ab&nbsp;risques locatifs&nbsp;\u00bb.<\/p>\n\n\n\n<p>Dans la pratique, on retiendra une valeur au m2, selon l\u2019\u00e9tat du b\u00e2ti.<\/p>\n\n\n\n<p>L\u2019industriel pourra s\u2019exon\u00e9rer de ces risques locatifs s\u2019il dispose dans son bail d\u2019une clause de renonciation \u00e0 recours r\u00e9ciproque bien \u00e9crite&nbsp;du type :<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; \u00ab&nbsp;Le bailleur et ses assureurs renoncent \u00e0 exercer tout recours contre le preneur et ses assureurs, et r\u00e9ciproquement&nbsp;\u00bb.<\/p>\n\n\n\n<p>12.1 Machines et \u00e9quipements&nbsp;:<\/p>\n\n\n\n<p>Il s\u2019agira d\u2019inventorier l\u2019ensemble du parc machines.<\/p>\n\n\n\n<p>Cet inventaire se fera (sauf contrat en valeur \u00e0 neuf) en \u00ab&nbsp;valeur de remplacement&nbsp;\u00bb&nbsp;: Il s\u2019agit d\u2019avoir la certitude que l\u2019assureur nous replace dans l\u2019\u00e9tat o\u00f9 nous \u00e9tions la veille du sinistre. Il ne s\u2019agit donc pas de valeurs nettes comptables.<\/p>\n\n\n\n<p>Cette \u00e9valuation pourra se faire en faisant appel \u00e0 un expert d\u2019assur\u00e9 d\u00e9j\u00e0 \u00e9voqu\u00e9.<\/p>\n\n\n\n<p>L\u2019expert d\u2019assur\u00e9 inventorie les biens, les \u00e9value, les photographie.<\/p>\n\n\n\n<p>Son rapport est annex\u00e9 au contrat d\u2019assurances.<\/p>\n\n\n\n<p>Ce rapport contribue \u00e0 faire baisser (de 5 \u00e0 10%) la prime d\u2019assurances.<\/p>\n\n\n\n<p>Ce rapport pourra \u00eatre r\u00e9actualis\u00e9 \u00e0 moindre frais tous les 2-3 ans.<\/p>\n\n\n\n<p>Il tend \u00e0 l\u2019\u00e9vidence \u00e0 faciliter la r\u00e9solution de sinistres ult\u00e9rieurs.<\/p>\n\n\n\n<p>12.2 Le bris de machines&nbsp;:<\/p>\n\n\n\n<p>A noter que les machines, surtout si elles sont&nbsp;:<\/p>\n\n\n\n<p>-en leasing<\/p>\n\n\n\n<p>-neuves<\/p>\n\n\n\n<p>-importantes<\/p>\n\n\n\n<p>-complexes<\/p>\n\n\n\n<p>pourront \u00eatre garanties en \u00ab&nbsp;bris de machines&nbsp;\u00bb (et donc d\u00e9duites de l\u2019inventaire pr\u00e9c\u00e9dent).<\/p>\n\n\n\n<p>Le \u00ab&nbsp;bris de machines&nbsp;\u00bb les garantit contre les avaries ordinaires (incendie,..) mais aussi contre des \u00e9v\u00e8nements fortuits appel\u00e9s \u00ab&nbsp;bris internes&nbsp;\u00bb.<\/p>\n\n\n\n<p>12.3 La r\u00e8gle proportionnelle<\/p>\n\n\n\n<p>En th\u00e9orie, l\u2019assur\u00e9 doit d\u00e9clarer de mani\u00e8re pr\u00e9cise (avec une marge de 10 \u00e0 20%) son capital&nbsp;:<\/p>\n\n\n\n<p>-sans sur-d\u00e9claration (double assurance proscrite)<\/p>\n\n\n\n<p>-sans sous-d\u00e9claration, qui conduirait -\u00e0 condition cependant que la bonne foi soit av\u00e9r\u00e9e- \u00e0 l\u2019application d\u2019une \u00ab&nbsp;r\u00e8gle proportionnelle&nbsp;\u00bb (une forme de punition) en cas de sinistre.<\/p>\n\n\n\n<p>L\u2019industriel qui fait entrer ou sortir continuellement des \u00e9quipements s\u2019exon\u00e9rera de cette contrainte en n\u00e9gociant une \u00ab&nbsp;abrogation de la r\u00e8gle proportionnelle&nbsp;\u00bb&nbsp;: en cas de sinistre sur une machine, on se contentera d\u2019expertiser et indemniser la machine, sans consid\u00e9ration du total d\u00e9clar\u00e9.<\/p>\n\n\n\n<p>12.4 La garantie automatique des investissements&nbsp;:<\/p>\n\n\n\n<p>De m\u00eame, l\u2019industriel qui fait rentrer une nouvelle machine ou site par exemple\u2026 un vendredi en fin d\u2019apr\u00e8s-midi souhaitera un m\u00e9canisme pour que ce nouveau bien soit automatiquement assur\u00e9 (avant que, ult\u00e9rieurement, on ne proc\u00e8de \u00e0 un avenant contractuel plus pr\u00e9cis).<\/p>\n\n\n\n<p>12.5 La perte d\u2019exploitation&nbsp;:<\/p>\n\n\n\n<p>Au-del\u00e0 des valeurs de biens et de leur indemnisation, l\u2019attention se porte de plus en plus vers la perte financi\u00e8re li\u00e9e \u00e0 un sinistre.<\/p>\n\n\n\n<p>En effet, que sert de se faire rembourser une machine d\u2019une valeur de 10 000 euros, si la perte de cette machine occasionne en r\u00e9alit\u00e9 (par un arr\u00eat de ligne) une perte d\u2019exploitation quotidienne de 100 000 euros&nbsp;?<\/p>\n\n\n\n<p>La PE (ou perte d\u2019exploitation) est ainsi une garantie&nbsp;:<\/p>\n\n\n\n<p>-relativement on\u00e9reuse (35 \u00e0 40 % de l\u2019assurance dommage)<\/p>\n\n\n\n<p>-pas forc\u00e9ment n\u00e9cessaire (selon le degr\u00e9 de redondance des lignes de fabrication)<\/p>\n\n\n\n<p>-dont la dur\u00e9e d\u00e9pendra du \u00ab&nbsp;cycle industriel&nbsp;\u00bb de l\u2019entreprise&nbsp;: combien de temps me faut-il pour recommencer \u00e0 travailler&nbsp;?<\/p>\n\n\n\n<p>La PE joue normalement APRES sinistre garanti (incendie,..), ce qui a donn\u00e9 lieu \u00e0 des discussions au moment du Covid.<\/p>\n\n\n\n<p>Elle peut s\u2019accompagner de clauses annexes telles que&nbsp;:<\/p>\n\n\n\n<p>-impossibilit\u00e9 d\u2019acc\u00e8s<\/p>\n\n\n\n<p>-mouvements sociaux<\/p>\n\n\n\n<p>-carence de fournisseurs ou de clients<\/p>\n\n\n\n<p>12.6 Les formules \u00ab&nbsp;tout sauf&nbsp;\u00bb&nbsp;:<\/p>\n\n\n\n<p>La clause \u00ab&nbsp;tous risques sauf&nbsp;\u00bb permet d\u2019\u00e9viter les mauvaises surprises<\/p>\n\n\n\n<p>-au lieu que l\u2019usine soit assur\u00e9e contre une litanie de garanties (\u00ab&nbsp;risques d\u00e9nomm\u00e9s&nbsp;\u00bb), le contrat pr\u00e9voit une garantie globale, sauf une page d\u2019exclusions \u00e0 lire avec attention.<\/p>\n\n\n\n<p>Cette formule permet d\u2019\u00e9viter des refus de remboursement face \u00e0 des \u00e9v\u00e8nements tels que&nbsp;:<\/p>\n\n\n\n<p>-un choc de v\u00e9hicule non identifi\u00e9 (une camionnette percute de nuit la barri\u00e8re de l\u2019usine)<\/p>\n\n\n\n<p>-un effondrement de racks (une \u00e9tag\u00e8re mal \u00e9quilibr\u00e9e a entra\u00een\u00e9 la suivante puis toutes dans sa chute)<\/p>\n\n\n\n<p>12.7 La LCI (limitation contractuelle d\u2019indemnit\u00e9)&nbsp;:<\/p>\n\n\n\n<p>Cette clause plafonne la garantie globale de l\u2019assureur, ind\u00e9pendamment des garanties individuelles.<\/p>\n\n\n\n<p>Elle permet une baisse de prime, l\u2019assureur connaissant son plafond de remboursement.<\/p>\n\n\n\n<p>Cette LCI est applicable \u00e0 une sous-limite du contrat. Elle peut ainsi notamment servir \u00e0 limiter le montant (et donc la dur\u00e9e) de la perte d\u2019exploitation.<\/p>\n\n\n\n<p>12.8 La franchise&nbsp;:<\/p>\n\n\n\n<p>Avec la LCI, c\u2019est un outil essentiel de r\u00e9tention du risque et de ma\u00eetrise du niveau de prime.<\/p>\n\n\n\n<p>L\u2019assureur va abaisser sa prime en fonction de l\u2019effort d\u2019auto-assurance que fait l\u2018industriel.<\/p>\n\n\n\n<p>Ainsi&nbsp;:<\/p>\n\n\n\n<p>-le passage d\u2019une franchise de 500 euros \u00e0 5000 est susceptible de faire chuter la prime de 40%&#8230;<\/p>\n\n\n\n<p>-rappelons aux PME que leurs comp\u00e9titeurs des grands groupes pratiquent all\u00e8grement l\u2019auto-assurance (avec des franchises de 1 mio EUR.. qu\u2019il ne reste plus qu\u2019\u00e0 se r\u00e9partir entre entit\u00e9s du groupe).<\/p>\n\n\n\n<p>Cette \u00ab&nbsp;r\u00e9tention&nbsp;\u00bb a d\u2019autres avantages&nbsp;:<\/p>\n\n\n\n<p>Ainsi, une grande entreprise de transport qui provisionne une franchise interne de 500 000 euros (et qui donc ne s\u2019assure qu\u2019au-del\u00e0 de ce seuil) va supporter une prime d\u2019assurance bien plus faible (une \u00ab&nbsp;deuxi\u00e8me ligne&nbsp;\u00bb) et, de ce fait, \u00e9conomiser des taxes d\u2019assurances qui \u00e9taient non r\u00e9cup\u00e9rables.<\/p>\n\n\n\n<p>12.9 Les autres outils de r\u00e9tention du risque&nbsp;:<\/p>\n\n\n\n<p>Plus l\u2019entreprise est importante, plus elle est \u00e0 m\u00eame (et encline) \u00e0 b\u00e2tir ses propres outils de r\u00e9tention&nbsp;:<\/p>\n\n\n\n<p>-cabinet de courtage captif&nbsp;:<\/p>\n\n\n\n<p>lui permettant<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -d\u2019\u00e9conomiser sur les co\u00fbts d\u2019interm\u00e9diation<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -de mieux conna\u00eetre les couts du march\u00e9<\/p>\n\n\n\n<p>-captive d\u2019assurance&nbsp;:<\/p>\n\n\n\n<p>V\u00e9ritable mini-compagnie d\u2019assurance (en g\u00e9n\u00e9ral g\u00e9r\u00e9e au quotidien par le courtier), elle lui permet un acc\u00e8s au march\u00e9 de gros de l\u2019assurance, et surtout d\u2019\u00e9viter les inconv\u00e9nients fiscaux de la simple provision interne de risque.<\/p>\n\n\n\n<p>Au minimum, le groupe industriel recrutera un \u00ab&nbsp;<em>risk manager<\/em>&nbsp;\u00bb, vrai professionnel susceptible de b\u00e2tir et conduire la politique du groupe dans ce domaine<\/p>\n\n\n\n<p>12.10 Le cas de l\u2019international&nbsp;:<\/p>\n\n\n\n<p>D\u00e8s que l\u2019entreprise poss\u00e8de ne serait-ce qu\u2019un petit bureau commercial \u00e0 l\u2019\u00e9tranger, le courtier devra mobiliser d\u2019autres moyens&nbsp;:<\/p>\n\n\n\n<p>-aux USA, il faudra obligatoirement s\u2019adjoindre la collaboration courtier local (par \u00e9tat)<\/p>\n\n\n\n<p>-on pourra \u00e9ventuellement souscrire aux Lloyds, pour b\u00e9n\u00e9ficier d\u2019une couverture mondiale (toutes les compagnies n\u2019\u00e9tant pas familiaris\u00e9es avec la souscription internationale)<\/p>\n\n\n\n<p>-certains pays imposent une assurance locale obligatoire. L\u2019industriel s\u2019assurera donc en fa\u00e7ade localement, mais se r\u00e9assurera dans son pays d\u2019origine (\u00e9ventuellement via sa captive, voir supra), selon le m\u00e9canisme du <em>fronting<\/em>.<\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>L\u2019apport du courtier&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>Il est ici d\u00e9terminant et multiple&nbsp;:<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-bonne analyse du bail<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-bonne \u00e9valuation ou r\u00e9\u00e9valuation des capitaux<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-vraie r\u00e9flexion sur la perte d\u2019exploitation<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-n\u00e9gociation \u00e9ventuelle d\u2019assurances au 1<sup>er<\/sup> risque (en cas de multiplication de risques isol\u00e9s)<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-simulation des effets d\u2019une hausse de franchise<\/em><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background\"><em>-v\u00e9rification des couvertures \u00e0 l\u2019international<\/em><br><\/p>\n\n\n\n<p><strong>Conclusion\u00a0:<\/strong><\/p>\n\n\n\n<p>Le contrat d\u2019assurances \u00ab&nbsp;risque industriel&nbsp;\u00bb r\u00e9sulte donc d\u2019un dialogue intense entre l\u2019industriel et le souscripteur (les souscripteurs) via le courtier.<\/p>\n\n\n\n<p>Ce dialogue ne peut avoir lieu et d\u00e9boucher sur un projet de de contrat qu\u2019\u00e0 la condition que le souscripteur puisse disposer, rapidement, des informations qu\u2019il souhaite et sous une forme qualitative.<\/p>\n\n\n\n<p>Une des premi\u00e8res pr\u00e9occupations du courtier sera donc de rassembler et ordonner une masse importante d\u2019information&nbsp;:<\/p>\n\n\n\n<p>-NDA (Non disclosure agreement), document assurant l\u2019industriel de la confidentialit\u00e9 de ses donn\u00e9es<\/p>\n\n\n\n<p>-donn\u00e9es sur la firme (actionnariat, kBis, bilans, masse salariale, baux..)<\/p>\n\n\n\n<p>-donn\u00e9es sur les contrats ant\u00e9rieurs (copies et relev\u00e9s de sinistralit\u00e9)<\/p>\n\n\n\n<p>-donn\u00e9es sur les sites (plans, photos, ..)<\/p>\n\n\n\n<p>-donn\u00e9es sur la technologie employ\u00e9e<\/p>\n\n\n\n<p>-donn\u00e9es sur les certificats (Q1, Q4, Q18,Q19,..)<\/p>\n\n\n\n<p>-inventaire des machines<\/p>\n\n\n\n<p>Ce n\u2019est qu\u2019\u00e0 cette conditions qu\u2019une telle \u00e9tude sera entreprise.<\/p>\n\n\n\n<p>Si l\u2019\u00e9tude se r\u00e9v\u00e8le trop importante et trop mobilisatrice, elle pourra donner lieu \u00e0 un facturation initiale, r\u00e9cup\u00e9rable en tout ou partie si le courtier devient gestionnaire de l\u2019affaire.<\/p>\n\n\n\n<p>Ces honoraires de mise en place sont pleinement justifi\u00e9s&nbsp;:<\/p>\n\n\n\n<p>-le courtier apporte en compl\u00e9ment \u00e0 l\u2019industriel ses conseils sur la contractualisation&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -mise en place \u00e9ventuelle d\u2019un contrat pluriannuel, moins cher<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -choix du fractionnement (mensuel, trimestriel,&#8230;)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -p\u00e9rim\u00e8tre de l\u2019\u00e9tude (holding, filiales \u00e0 int\u00e9grer,..)<\/p>\n\n\n\n<p>-il en profite pour faire un inventaire des autres contrats \u00e0 retravailler&nbsp;:<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -assurance des dirigeants<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -assurance transport de marchandises<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -RC environnement d\u00e9j\u00e0 \u00e9voqu\u00e9e<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -cyber (jug\u00e9 premier risque d\u2019apr\u00e8s l\u2019\u00e9tude annuelle Allianz 2023)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -assurance des v\u00e9hicules (flotte, auto-mission,..)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -assurance du poste client (assurance-cr\u00e9dit)<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -sant\u00e9-rapatriement pour les cadres mobiles<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -assurances collectives&nbsp;:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -sant\u00e9<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -pr\u00e9voyance<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -retraite<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -\u00e9pargne salariale<\/p>\n\n\n\n<p>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; -indemnit\u00e9s de d\u00e9part \u00e0 la retraite<\/p>\n\n\n\n<p>Emmanuel Blachez&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Frenchbrokers&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <a href=\"mailto:info@frenchbrokers.fr\">info@frenchbrokers.fr<\/a><\/p>\n\n\n\n<p>Fran\u00e7ois Lain\u00e9&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Septembre 2023<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" src=\"https:\/\/frenchbrokers.fr\/wp-content\/uploads\/2023\/08\/76-PPRT-ZIP_Le_Havre-1024x724.png\" alt=\"\" class=\"wp-image-1072\" srcset=\"https:\/\/frenchbrokers.fr\/wp-content\/uploads\/2023\/08\/76-PPRT-ZIP_Le_Havre-1024x724.png 1024w, https:\/\/frenchbrokers.fr\/wp-content\/uploads\/2023\/08\/76-PPRT-ZIP_Le_Havre-300x212.png 300w, https:\/\/frenchbrokers.fr\/wp-content\/uploads\/2023\/08\/76-PPRT-ZIP_Le_Havre-768x543.png 768w, https:\/\/frenchbrokers.fr\/wp-content\/uploads\/2023\/08\/76-PPRT-ZIP_Le_Havre-1536x1086.png 1536w, https:\/\/frenchbrokers.fr\/wp-content\/uploads\/2023\/08\/76-PPRT-ZIP_Le_Havre-2048x1448.png 2048w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Executive summary: To insure property means: -taking into account large amount of investments -ensuring the continuation of the business in the eventuality of an adverse event -protecting the staff and the neighbors INRS defines \u201cindustrial risk\u201d as: \u201can accidental event occurring on an industrial site involving dangerous products and\/or processes and resulting in serious immediate &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/frenchbrokers.fr\/?p=1071\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;L&#8217;assurance des risques industriels: Les 12 travaux d&#8217;Hercule&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1071","post","type-post","status-publish","format-standard","hentry","category-non-classe"],"_links":{"self":[{"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=\/wp\/v2\/posts\/1071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1071"}],"version-history":[{"count":3,"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=\/wp\/v2\/posts\/1071\/revisions"}],"predecessor-version":[{"id":1076,"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=\/wp\/v2\/posts\/1071\/revisions\/1076"}],"wp:attachment":[{"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/frenchbrokers.fr\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}